Here are just a few considerations to think about when considering building a modular data center.

 

Deployment costs

- Equipment-related costs (such as hardware and software).

- The cost of installing and commissioning the facility.

Shipping

- Depends on the deployment location and physical distance between site and point of modular manufacture.

- Damage.

- Legal restrictions on length and width.

Hardware assembly

- Components that need to be unpacked, checked, assembled and integrated

Software integration

Project management

Commissioning

Operational costs

Efficient design

Cooling optimization

Systems management