Growing capacity needs and big competition in the cloud and colocation markets are causing equipment efficiency and energy costs to once again be top-of-mind for data center owners, operators and even information technology teams. Today, a primary factor limiting data center capacity is the ability to quickly and cost-effectively accommodate growing power requirements. Furthermore, the capability to do so while maintaining a low PUE and high-energy efficiency is critical for the growth and competitive advantage of data center providers. Operating at a low Power Usage Effectiveness (PUE) is key - and largely dependent on data centers’ critical infrastructure equipment.
To help meet growing capacity needs, data centers are looking to third-party preventive maintenance providers who, together with their utility partners, can offer integrated solutions and incentive programs that can reduce costs and positively impact equipment replacement or upgrade decisions.
Equipment Affects Efficiency
Built to run 7x24x365, most data center equipment has a life expectancy of approximately 10 to 15 years. Equipment parts, however, have a much more limited lifespan. Proper equipment maintenance, or lack thereof, can have a profound impact on lifecycles and data center operations, posing a threat to reliability, uptime and efficiency through increased service and repair. For example, older Uninterruptible Power Supply (UPS) units tend to operate at 10 percent less efficiency than their newer counterparts.
Technology advancements have had dramatic effects on equipment. In cooling equipment, for example, the introduction of variable speed fan motor drives, Electronically Commutated (EC) fan motors, and digital scroll compressors have resulted in increased efficiencies. Modern UPS equipment also features "econo-modes,” which allow them to run in bypass mode within a normal operation and switch to online mode if a fluctuation in power occurs. Even with these features, UPS units in service for 10 years will likely require most parts, if not the entire unit, to be replaced.
Energy Incentive Programs
A preventive maintenance program is critical to ensuring maximum uptime and efficiency in a data center. In addition to helping users know exactly when to upgrade or replace equipment through continuous efficiency, reliability and site uptime analysis, they can also identify predictive signs of failure such as capacity leakage or high motor amperage. These efficiency-focused equipment projects are usually eligible for utility incentives, yielding operating cost reductions and in many cases, actually being largely funded by the utility.
Along with financial incentives, data centers that take advantage of these programs also benefit from multiple sets of efficiency and gain insight from engineering experts who can offer consultation services. Engineering partners like EEC are able to offer objective analyses of infrastructure, review maintenance costs and contracts, measure energy consumption, research parts availability, conduct capacity planning analysis, and more to help data centers make the right efficiency decisions at the right time.
To learn more, watch the webinar "How Utility Programs Affect Equipment Upgrade Decisions." or download this ebook on energy efficiency.